Last step getting dried in.  installing the . On to the next phase.
12/25/2025

Last step getting dried in. installing the . On to the next phase.

Wasn’t expecting views of the Space Needle, Mt Rainier, and the Olympics from the rooftop.
10/23/2025

Wasn’t expecting views of the Space Needle, Mt Rainier, and the Olympics from the rooftop.

The benefits of having a inspector that understands the  Zip system. The inspector allows us to tape the seams during ou...
10/11/2025

The benefits of having a inspector that understands the Zip system. The inspector allows us to tape the seams during our rare dry days and also before standing the upper floors.

Insulated and ready for concrete.
09/16/2025

Insulated and ready for concrete.

Corners staked only means one thing. Time to start forming the footings.
08/07/2025

Corners staked only means one thing. Time to start forming the footings.

Back down to the foundation.
07/26/2025

Back down to the foundation.

Amazed to get a blower door score this low. Once we remembered to seal the dryer vent we scored 1.30. Thank you  for com...
08/18/2022

Amazed to get a blower door score this low. Once we remembered to seal the dryer vent we scored 1.30. Thank you for coming out for a quick test. Now to see if we can get this below 1. We used the 2.0 system as calls it AirDam and fast flash on the windows and fentrim on the stem wall connection.

24 gauge Nu-Ray metal roof installed over  Zip panels. Roofing penetrations have been minimized to 3 vents, 1 duct and, ...
05/26/2022

24 gauge Nu-Ray metal roof installed over Zip panels. Roofing penetrations have been minimized to 3 vents, 1 duct and, 1 conduit.

DWV pipe runs complete (minus a part on back order). HVAC complete (minus parts on back order). Im sensing a theme for 2...
04/16/2022

DWV pipe runs complete (minus a part on back order). HVAC complete (minus parts on back order). Im sensing a theme for 2022.

Getting the patio ready for a pour next week. Hopefully Washington weather hold out 🤞.
03/25/2022

Getting the patio ready for a pour next week. Hopefully Washington weather hold out 🤞.

I always keep the 6 mm Viking Arm in my truck. It is the easiest way to correct the bow out of a window frame 💪.
02/17/2022

I always keep the 6 mm Viking Arm in my truck. It is the easiest way to correct the bow out of a window frame 💪.

Recessed sill for 14’  bifold. Waterproof with  ziptape and a metal sill pan for double the protection.
02/09/2022

Recessed sill for 14’ bifold. Waterproof with ziptape and a metal sill pan for double the protection.

Address

Puyallup, WA

Telephone

+12538304092

Website

Alerts

Be the first to know and let us send you an email when Samra Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Samra Construction:

Share

Category