Mark Duncan Construction

Mark Duncan Construction contact me at 870 213 7187

Got these kitchen cabinets, laundry shelf and bathroom vanity painted. Got a little touch up to do but not bad for first...
03/01/2023

Got these kitchen cabinets, laundry shelf and bathroom vanity painted. Got a little touch up to do but not bad for first time painting new cabinets. Thanks for the tips Jack (Jax Painting)

02/17/2023
Removed old faded vinyl sidi g and replaced with new prefi ished LP Smart siding and new soffit and fascia. Along with s...
02/17/2023

Removed old faded vinyl sidi g and replaced with new prefi ished LP Smart siding and new soffit and fascia. Along with some new windows by back door.
Some before and after shots.

We even do those small projects like this A/C cover, that was completed 1 day before the first snow.
02/05/2023

We even do those small projects like this A/C cover, that was completed 1 day before the first snow.

Some 18x18 tile down and some oak trim to finish it out.
01/17/2023

Some 18x18 tile down and some oak trim to finish it out.

Work in progress in Fairfield Bay.
01/06/2023

Work in progress in Fairfield Bay.

Some handrail repair and steps down to river tore out and replaced and a few dock boards replaced.  There for just a day...
09/29/2022

Some handrail repair and steps down to river tore out and replaced and a few dock boards replaced. There for just a day but nice change of scenery from the lake.

Deck with steps and landings down to river in Pangburn. Before anybody ask, the cable did not continue down the steps du...
06/28/2022

Deck with steps and landings down to river in Pangburn.
Before anybody ask, the cable did not continue down the steps due to we connected to a section that had been done last year. But I think it turned out nice.

Haven't shared anything in a while, here is the front door of house that was completed earlier in the spring.
06/28/2022

Haven't shared anything in a while, here is the front door of house that was completed earlier in the spring.

This picture was taken at lunch time on day 2 of construction. Winter weather has held things up but should be in the dr...
02/04/2022

This picture was taken at lunch time on day 2 of construction. Winter weather has held things up but should be in the dry next week.

Window upgrade for this old house in Leslie.From single glass aluminum to new vinyl with double insulated glass.
10/28/2021

Window upgrade for this old house in Leslie.
From single glass aluminum to new vinyl with double insulated glass.

Couple before, during and after. New siding and new deck.
08/22/2021

Couple before, during and after. New siding and new deck.

Address

Prim, AR
72130

Telephone

+18702137187

Website

Alerts

Be the first to know and let us send you an email when Mark Duncan Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category