02/23/2024
Custom bathroom completed! We just installed shower door today. Removed an old existing fiberglass tub/surround, old toilet and sink and jackhammered out the tiled floor. We Installed all new water shutoffs throughout. We then leveled and tiled the floor and walls with large format tiles, installed a new fan/light combo and a new vanity light. Also a new vanity and faucet, toilet and mirror. Shower has all new controls and 3 way diverter valve for different showerhead and handheld options. Also has a color matching black shower niche for storage. Costomer requested grab bars for safety installed in shower. Grab bars have solid blocking to ensure stability. We also painted ceiling with 2 coats of a white semi gloss and walls a "moonshot" light grey. As always all work done in house. No subcontractors. Love the black trim throughout the bathroom.