06/18/2026
SSC is excited to have construction underway on our chilled water line project in downtown Phoenix. This project allows our crews to put several different services to work, including a 75” tunnel to carry the chilled water lines under Fillmore Street, open-cut trenching along 5th Street in front of the site of the future ASU Health building, and vacuum excavating for potholing and slot trenching to ensure safe excavation throughout. This is the first segment of the project that will provide chilled water to cool several buildings in the Phoenix Bioscience Corridor.