RAD Construction

Call Directions Website Contact the business

RAD Construction Remodeling/Repair And Demolition services.

09/18/2026

Wood laminate floor installation!

*I do not own rights to this music*

Some more random drywall projects: A/C unit removed and sealed from outside needed framing and drywall; previous square ...
09/18/2026

Some more random drywall projects: A/C unit removed and sealed from outside needed framing and drywall; previous square entry way converted to archway; and the final results of Skylight being installed.

09/18/2026

Closet upgrade: ran a junction box from main light power over ceiling to add a recessed light inside the closet. We then raised the closet door header up 6" to accomodate the installation of sliding mirror doors. Drywall and compound it up... fin! (🤣🤣🤣 I gotta help self before I help others)

09/15/2026

Life of a contractor:

- in the last 6 months, I have had to spend close to $10,000.00 on my work truck just to keep my business flowing and to fulfill these contracts

- in the last 3 years, my car insurance and business insurance has essentially doubled

- in the last 5 years, every piece of material and every tool I use - recurring and specific - has doubled and more in price at some point in time

We are all paying for higher groceries, tricking bills, medical bills, gas prices, etc... and no one complains to the billionaires.

But, I better not dare raise my prices. 🤣🤣🤣🤣🤣🤣🤣🤷🏾‍♂️🤦🏾‍♂️

09/10/2026

First time putting in a Skylight and constructing the chute for it, as well.

08/16/2026

Same house and plan from previous post refinishing floors. We ran into a sanding and time issue when attempting to refinish the attic floor - some good melted and dried under the carpet causing the removal to be extremely difficult, compromising our deadline. We pivoted to a waterproof and pad for the floors and steps, using stairnose and quarter round to finish our end pieces, painting the risers white to finish the stairs.

08/16/2026

...remove carpet from floors & stairs, using drum & finish sander - 3 passes (grit 24-100-150) - sand all hardwood floors, two coats of sealer and 2 coats of finisher (no in between sanding required), lastly mop with a textured mop after 24 hours... done! First time using floor products. They are expensive as hell, but the results are undeniably good. The bona products also allowed me to shorten my work load. Happy with the results!

08/16/2026

With the help of Do Right And Kill Everything, we ripped these exterior steps up to replace the rotted right stair stringer. Removed risers and treads and one banister, took out bad stringer and threw a fresh jawn in there. After leveling, re-installed the risers and treads and banister.

*I do not own rights to this music*

I removed 2 double hung windows, re-framed the window opening and installed 2 single hung windows with trim on both side...
05/20/2026

I removed 2 double hung windows, re-framed the window opening and installed 2 single hung windows with trim on both sides... all before 1pm. What did you do today?

05/05/2026

From that to this...

*I do not own rights to the music*

Address

Philadelphia, PA

Alerts

Be the first to know and let us send you an email when RAD Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to RAD Construction:

Shortcuts

Sponsored

Share

Category