Standley Construction

Standley Construction new Construction, remodeling, and floor covering.

Installed new vinyle plank flooring in a house
08/28/2026

Installed new vinyle plank flooring in a house

We tore off the old backsplashes and installed a new one with subway tiles.
07/12/2026

We tore off the old backsplashes and installed a new one with subway tiles.

We screened in a back porch and built a bench along the wall with a covered walkway
07/07/2026

We screened in a back porch and built a bench along the wall with a covered walkway

We made retaining walls and built up the driveway
07/03/2026

We made retaining walls and built up the driveway

We built a new room, added 4 new ceiling fans, and textured the walls.
06/20/2026

We built a new room, added 4 new ceiling fans, and textured the walls.

Repaired some rotted logs on a log house.
04/28/2026

Repaired some rotted logs on a log house.

Address

180 ACR 2106
Palestine, TX
75801

Alerts

Be the first to know and let us send you an email when Standley Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Standley Construction:

Shortcuts

Share