08/14/2025
We didn’t post DAY 2 as we ran out of there to AC and showers as it was extremely hot and the guys are asjusting to 10 hour days.
Here is DAY 3. We drilled, cleaned, set posts and poured around 2/3 of the 1000’ and 400 bags of concrete project. The rocks on the West side of property tried to beat us up but our guys took care of business. We can’t say enough, nor appreciate enough when it comes to our crew. HELLUVA crew!
This fence requires precision, and patience as it is very challenging when it comes to measurements, depth of posts and level. However, our guys are winning on this project as so far the lines are straight, level and measurements are tight. Buckely fence is definitely not for the average joe out there!
We have to mention our chubby little friend, as he comes out and inspects for us. Not to mention the smiles he brings. What a Peach this guy is!
Stay tuned as DAY 4 may show some rails in the posts around the house. We need to get the tarps, dirt, sprinklers back on and materials off the green grass for the long weekend.