10/16/2026
🚧 Calamity Acres Project Update 🚧
After completing inspections, we moved into insulation and made sure everything was properly dried and ready before closing up the walls.
RCI had three HEPA filtration units running as part of the drying process. This is something RCI does to help ensure the materials have reached the proper moisture content before Sheetrock is hung. Taking the extra time at this stage helps make sure everything behind the walls is right before moving forward.
Now the Sheetrock is going up, and it won’t be long before cabinets and trim start going in.
Calamity Acres is really starting to take shape! 🏡🔨
As always, the credit goes to my hard-working crew, none of this would be possible without them.