Grout done moved the tub in have to level it then mount it . Then install the vanity, toilet and all the fixtures after ...
09/04/2024

Grout done moved the tub in have to level it then mount it . Then install the vanity, toilet and all the fixtures after they paint.

Well all the tile is done. Need to grout and set all the f the bathroom fixtures. After they finish painting.
09/04/2024

Well all the tile is done. Need to grout and set all the f the bathroom fixtures. After they finish painting.

Bathroom shower I did a few years ago. Did some floor repair around toilet and tiled it instead of the wood floor.
08/31/2024

Bathroom shower I did a few years ago. Did some floor repair around toilet and tiled it instead of the wood floor.

Tile moving right along. Got the floors down, the niches and the back wall up.
08/29/2024

Tile moving right along. Got the floors down, the niches and the back wall up.

Passed all the inspections. Finally started the tile.
08/28/2024

Passed all the inspections. Finally started the tile.

So I got call to try and salvage this shower. And make it a walk in. Cutting and jackhammer today.
08/24/2024

So I got call to try and salvage this shower. And make it a walk in. Cutting and jackhammer today.

Insulation and drywall starting to go up all the vent lines are finished. And self-leveling for the floor pan is done.
08/22/2024

Insulation and drywall starting to go up all the vent lines are finished. And self-leveling for the floor pan is done.

Finally got the concrete Chipped away and new drains going in.
08/14/2024

Finally got the concrete Chipped away and new drains going in.

Got all the concrete jack hammered.can start running new drains.and get the Walk in shower Pan in.waiting for tub. So I ...
08/09/2024

Got all the concrete jack hammered.can start running new drains.and get the Walk in shower Pan in.waiting for tub. So I know where to put the tub drain.

This one is going to be fun. Not sure how the tub was draining.
08/08/2024

This one is going to be fun. Not sure how the tub was draining.

Take 2. Cut and removed corner o pan build a bench and started waterproofing. Almost back on track.
08/03/2024

Take 2. Cut and removed corner o pan build a bench and started waterproofing. Almost back on track.

Moving along. And now I'm told they want a bench in the shower. So I get to rip out and start over.
07/31/2024

Moving along. And now I'm told they want a bench in the shower. So I get to rip out and start over.

What a pain.  But they are all up  grout next.
07/19/2024

What a pain. But they are all up grout next.

Got this one painted today.
07/14/2024

Got this one painted today.

Finally got the plumbing inspection. Drywall time.
07/06/2024

Finally got the plumbing inspection. Drywall time.

Finished up the  small bathroom today. Customer is going to do the paint. And yes there are new switch covers just didn'...
07/03/2024

Finished up the small bathroom today. Customer is going to do the paint. And yes there are new switch covers just didn't take a photo..

Last of the tile installed and second coat of mud on the walls. Grout tomorrow.
07/01/2024

Last of the tile installed and second coat of mud on the walls. Grout tomorrow.

Pretty in pink. Most of Walls are up ran out of spacer.
06/29/2024

Pretty in pink. Most of Walls are up ran out of spacer.

Floor tile down .
06/29/2024

Floor tile down .

New tub in shower valves in drywall up first coat of mud on concrete sealed waterproofing on around tub surround next la...
06/27/2024

New tub in shower valves in drywall up first coat of mud on concrete sealed waterproofing on around tub surround next lay uncoupling membrane and start tiling.

Demo done.
06/25/2024

Demo done.

99% done. Customer is going to paint and Stan barn door then I can put the last of the baseboards up and hang barn door....
06/20/2024

99% done. Customer is going to paint and Stan barn door then I can put the last of the baseboards up and hang barn door..

Almost. Few more details to take care of then it will be finished.
06/17/2024

Almost. Few more details to take care of then it will be finished.

Grout done and Glass panel is set. Texture tomorrow.
06/15/2024

Grout done and Glass panel is set. Texture tomorrow.

Tile is all up  grout tomorrow.
06/14/2024

Tile is all up grout tomorrow.

Wall tile going up. Lots of cuts and holes.
06/10/2024

Wall tile going up. Lots of cuts and holes.

Grout done. Tomorrow start the Walls.
06/09/2024

Grout done. Tomorrow start the Walls.

Finally. Tile is going down. Grout tomorrow then start the walls.
06/08/2024

Finally. Tile is going down. Grout tomorrow then start the walls.

Floor leveled. Shower pan in. Uncoupling membrane down  first coat of water proofing on. And second coat of mud on the w...
06/06/2024

Floor leveled. Shower pan in. Uncoupling membrane down first coat of water proofing on. And second coat of mud on the walls. Almost ready to start to tile .

Another house I'm working on. Rough in plumbing done and tied into house main plumbing line. Now waiting for city inspec...
05/30/2024

Another house I'm working on. Rough in plumbing done and tied into house main plumbing line. Now waiting for city inspector. . So back over to the other house bathroom I'm working on.

Address

Norco, CA
92860

Website

Alerts

Be the first to know and let us send you an email when Knoth Home Repairs posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Knoth Home Repairs:

Share

Category



You may also like