08/19/2026
I am excited to share this remarkable transformation of our latest remodel project. The client needed a shower on the main floor, so we removed a coat closet and plumbed in a new standup shower. This required extensive work, including rerouting the HVAC, plumbing stack, and some of the electrical.
The end result is absolutely stunning, and the client could not be happier. Features of the new space include a 9 1/2-foot-tall shower surround wrapped in custom hexagon ceramic tile, custom shampoo and soap niche wrapped in cultured marble, Brushed nickel and chrome fixtures throughout by Moen , painted oak baseboards and trim as well as paint in “Pale Oak” by Glidden.