B&B Concrete

Call Directions Website Contact the business

B&B Concrete 🏗️ Concrete Construction Experts
📐 BIM • VDC • Tech-Driven Building
📍 NY | NJ | CT | Union
📩 DM or [email protected] | Build Better

10/07/2026

The pour may be finished, but the work isn’t.

A quick look at what happens after the forms come off, from addressing ties and patching to surface finishing and final cleanup.

It’s all part of making sure the finished product meets the B&B standard.

10/02/2026

Nine feet of concrete taking shape in Wappingers. 💪

Last week, our crew worked through the sports field retaining wall pour, bringing another major piece of the project together with careful planning, solid coordination, and steady ex*****on.

Big walls demand attention to detail, and the team stayed locked in from start to finish.

Another milestone in place. On to the next.

09/28/2026

One summer. A lot of concrete 🔥🙌

A big shoutout to Spec Formliners and Jamie for the hands-on support at Wappinger, New York project last week.Jamie join...
09/24/2026

A big shoutout to Spec Formliners and Jamie for the hands-on support at Wappinger, New York project last week.

Jamie joined our team on site to review our installation methods and QA/QC process for the decorative block formliner being installed on the exposed face of the field retaining wall. Having that level of product knowledge and field support helped us confirm the setup, details, and installation approach before moving forward.

Strong projects are built through strong partnerships, and we appreciate having knowledgeable partners who are willing to step into the field and work alongside the crew.

Thanks again to Jamie and the Spec Formliners team for the support.

For GCs, the best coordination issue is the one that gets resolved before it ever reaches the field.Our VDC workflow hel...
09/21/2026

For GCs, the best coordination issue is the one that gets resolved before it ever reaches the field.

Our VDC workflow helps identify clashes, rebar congestion, layout conflicts, and design changes early, so they can be addressed before they affect crews, sequencing, or the schedule.

The result: fewer field surprises, smoother coordination, less rework, and a more predictable concrete scope.

Because when the job is moving fast, the concrete contractor should help keep it moving, not slow it down.

09/18/2026

Another major placement completed at our Wappingers, New York project.

Our team recently poured 270 cubic yards of concrete for a retaining wall footing, marking an important step forward in the overall build. A pour of this scale takes more than manpower. It requires careful sequencing, clear communication, solid preparation, and a crew that stays focused from the first truck to the final placement.

The team brought their A-game throughout the operation, working together to keep the pour controlled, efficient, and on track.

We’re proud of the ex*****on in the field and the commitment shown by everyone involved. We also want to thank the GC, Butler Construction Group for their support and professionalism in executing this pour and for the opportunity to continue contributing to its progress.

One more major milestone in place, and we’re looking forward to what comes next.

The crew was back at Stony  Point, pouring the channel walls and pushing another phase of the project forward.With each ...
09/17/2026

The crew was back at Stony Point, pouring the channel walls and pushing another phase of the project forward.

With each pour, the structure continues to take shape. Strong coordination, careful ex*****on, and a crew staying locked in are keeping the momentum going.

One wall at a time. One milestone at a time. Progress keeps moving. 💪🏗️

Unpopular Opinion Speed gets attention. Efficiency gets the job done right.Build Better.What’s your take on concrete wor...
09/15/2026

Unpopular Opinion
Speed gets attention. Efficiency gets the job done right.
Build Better.
What’s your take on concrete work?
👇 Comment on an unpopular opinion, we’ll feature our favorite one next.

Great concrete work doesn’t start at the first pour. It starts with the right process behind it.At B&B Concrete, our VDC...
09/14/2026

Great concrete work doesn’t start at the first pour. It starts with the right process behind it.

At B&B Concrete, our VDC workflow helps us move from model-based takeoff and clash detection to constructability review, shop drawings, model-to-field coordination, and digital as-builts with greater clarity and control.

For GCs and engineers, that means better coordination, fewer surprises in the field, and more confidence from preconstruction through closeout.

Swipe through to see The B&B Way and how we bring precision from the model into the field.

Precision in the model. Confidence in the field.

09/12/2026

Before the cheers, the crowds, and the Friday night lights, there’s precision work like this.

Our team recently completed a bleacher pad pour for a high school in Wappingers, New York, where accurate layout, proper elevation control, reinforcement, and clean finishing all played a role in delivering a solid base for the structure above.

It may look like a simple slab, but getting it right takes planning, coordination, and experienced field ex*****on.

Built with precision today. Ready for years of use ahead. Build Better

Address

55 Old Nyack
Nanuet, NY
10954

Opening Hours

Monday 8am - 5am
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+18456244644

Alerts

Be the first to know and let us send you an email when B&B Concrete posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to B&B Concrete:

Shortcuts

Share