06/10/2026
Another solid project wrapped up this week for Earth Conservancy in Hanover Township.
Our crew replaced a failed 25 HP blower motor at the Askem treatment system on Dundee Road. The job included removing the existing motor, installing a new matching unit, replacing three 50-amp fuses, reconnecting everything, and putting the system through testing to make sure it was ready to go.
The old motor is gone, the new one is up and running, and the facility is back in operation.