09/18/2026
The Daniel Island Canopy Reserve is in its final stretch, and this week delivered one of the more memorable moments of the entire project.
A 1,300-pound pizza oven was craned over the roofline and set into place in the outdoor kitchen — there was no other practical way to get it there, and watching it hang against the sky was a reminder that even the finishing touches on a home like this take real coordination.
On the interior, wallpaper installation began this week, and paired with the decorative lighting now going in, the house finally reads the way we pictured it on paper. Plaster work continued alongside deep cleaning of tile, glass, and cabinetry, and the elevator is now fully operational.
Outside, the driveway has been poured and the infinity pool has been filled — the marsh view now framed by water on two levels instead of one.
A home like this comes together through a long list of small steps and each one gets us closer to the finish.
Architecture Clarke Design Group,LLC
Design Jenny Keenan Design
Landscape High Marsh Landscape Contractors