Peryer Construction

Peryer Construction 20+ yrs of experience!! Siding, roofing,Additions,Decks , garages, Kitchens, and other Remodeling!! (518)572-8184

Call today for a free quote and to discuss your project needs!!

Removed old window, siding. Installed new window, taped exterior nailing with sealant tape, spray foamed inside, reinsta...
06/17/2026

Removed old window, siding. Installed new window, taped exterior nailing with sealant tape, spray foamed inside, reinstalled siding and shutters, installed new window trim.

Roofs on, windows are in, o/h door prepped. Came along nicely for a few short days working on this project.
06/13/2026

Roofs on, windows are in, o/h door prepped. Came along nicely for a few short days working on this project.

Yesterday was truss day with the help of a Cpl men to help us get the trusses up on the wall! Then today was back to the...
06/05/2026

Yesterday was truss day with the help of a Cpl men to help us get the trusses up on the wall! Then today was back to the two man operation on putting the plywood up on the back side!

Two days of hustling!
06/03/2026

Two days of hustling!

Not bad for two days!!! Ready for trusses tomorrow!! Big thanks to Oshea’s excavating and concrete for a great foundatio...
06/03/2026

Not bad for two days!!! Ready for trusses tomorrow!!

Big thanks to Oshea’s excavating and concrete for a great foundation/floor.

Little covered porch, pre cast piers, fiberon composite decking, black composite post wraps. More to come!
06/02/2026

Little covered porch, pre cast piers, fiberon composite decking, black composite post wraps. More to come!

Well been a busy few weeks. Framed out basement walls, insulated, removed twisted main beam, new lvl beam installed, new...
05/07/2026

Well been a busy few weeks. Framed out basement walls, insulated, removed twisted main beam, new lvl beam installed, new electrical for entire house, bathroom gutted re sheet rocked and awaiting prime, paint and tile, kitchen gutted to studs, all new wiring, new insulation, framed in headers for windows as there was none, installed new cabinets. More to come over the next few weeks.

We are installing a new service entrance and panel box, updating plumbing, basement is underway of drywall being installed.

All finished up!Marvin essential windows! Black fiberglass with black pvc trim board on exterior. Removed siding, remove...
04/21/2026

All finished up!

Marvin essential windows! Black fiberglass with black pvc trim board on exterior.

Removed siding, removed old windows, installed the new windows, taped nailing fl**ge and spray foamed interior gap. New casing and window trim. Reinstalled siding with new j channel and some new siding where needed as shutters were not going back up.

Pre cast deck piers installed! Getting ready for a small deck with roof!
04/18/2026

Pre cast deck piers installed! Getting ready for a small deck with roof!

Projects are on their way!! We had to put in a new service entrance for this customer as we are getting ready to build a...
04/18/2026

Projects are on their way!!

We had to put in a new service entrance for this customer as we are getting ready to build a garage!
Also doing a screened in porch for this customer! More to come!

Address

2594 Route 11
Mooers, NY
12958

Website

Alerts

Be the first to know and let us send you an email when Peryer Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Peryer Construction:

Share

Category