06/17/2026
Not your typical receiving setup.
This receiving tunnel is being built with two leg pits and two receiving pits—designed to move grain efficiently across four separate grain piles.
Trucks will dump into either of the center receiving pits, where grain is transferred to one of two legs positioned at each end of the tunnel. From there, each leg feeds the conveyors serving two pile locations.
More capacity. More flow paths. More flexibility.
A lot of planning goes into making harvest move faster long before the first truck ever shows up.