07/06/2026
SLIP Trenchless upper and lower sewer lateral compliance project. The upper lateral was original Orangeburg which we replaced with a pipe bursting procedure and the existing lower lateral was VCP clay. The lower section we successfully inverted a new CIPP sewer liner with compressed airto the back of the city main line.