Webster Kitchen & Bath

Webster Kitchen & Bath Custom kitchen and bathroom remodeling in Reading, PA. Quality craftsmanship. Free estimates

Day one of a bathroom remodel does not look like much, and it is the most important day on the schedule.Paper starting t...
08/31/2026

Day one of a bathroom remodel does not look like much, and it is the most important day on the schedule.

Paper starting to come off, old fixtures still in, tools on the floor. This is where anyone first starts seeing the real condition of what is behind the surfaces. Whatever the old bathroom was covering up turns up now, while it is still a scheduling conversation, instead of later when the new work is already in and it costs a great deal more to deal with.

This one is right at the start.

Free estimates. Call (484) 513-2105.

There is nothing wrong with this room.Vaulted ceiling. Skylight. Two windows. A footprint most primary baths in this cou...
08/28/2026

There is nothing wrong with this room.

Vaulted ceiling. Skylight. Two windows. A footprint most primary baths in this county would envy. The bones are good and somebody built it carefully.

What dates it is all surface. Striped paper, gold trim, a jetted tub nobody has filled in years, and a shower you cannot see into or out of. Every one of those was a reasonable choice when it was made.

This is the part people get wrong when they start planning. They look at a room like this and assume it needs to be gutted back to the studs and reshaped. Usually it does not. The layout is already right. What has to change is everything you touch and everything you look at.

Knowing which is which is most of the job. Tearing out a wall that did not need to come out is how a budget disappears before the finishes get picked.

One point of contact from demo through punch list. Call or text (484) 513-2105.

The handshower is the part people underrate.It runs on a slide bar, so its height moves with whoever is usingit. Rinsing...
08/26/2026

The handshower is the part people underrate.

It runs on a slide bar, so its height moves with whoever is using
it. Rinsing a kid, washing a dog, cleaning the shower itself, none
of that works well off a fixed head eighty inches up.

The niche is recessed into the wall rather than hung on it, so
nothing sticks out into a space that is already tight, and there
is no shelf to rust or slip off a hook.

Neither of these costs more than the alternative. They just have to
be decided before the wall closes up, because afterward they are
not decisions anymore.

One point of contact from demo through punch list. Call or text
(484) 513-2105.

You will never see any of this once the job is done.New drain line and closet fl**ge set before the floor goes back down...
08/22/2026

You will never see any of this once the job is done.

New drain line and closet fl**ge set before the floor goes back down. Supply lines run and capped in an open wall. Floor tile laid out dry and numbered so the veining runs the way it should before a single tile gets set.

This is the part that decides whether a bathroom lasts twenty years or leaks in three. It is also the part nobody takes pictures of, so here they are.

One point of contact from demo through punch list.

Call or text (484) 513-2105 for a free estimate.

Two corners of a master bathroom worth showing side by side.The shower sits in a glass enclosure with a built-in niche a...
08/21/2026

Two corners of a master bathroom worth showing side by side.

The shower sits in a glass enclosure with a built-in niche and a half wall that keeps it open to the room instead of walling it off. The old layout had a stall behind frosted glass doing the opposite.

The vanity is a double, two sinks, wall-mounted faucets, a mirror over each. The walkway past it stays clear, which is the whole point.

If your bathroom feels smaller than the square footage says it should, the layout is usually the problem, not the size.

One point of contact from demo through punch list.

Webster Kitchen and Bath
Bathroom and kitchen remodeling across Reading and Berks County
(484) 513-2105

Nobody hires a contractor because of what is behind the tile. They should.Three steps out of a master bath build, in ord...
08/19/2026

Nobody hires a contractor because of what is behind the tile. They should.

Three steps out of a master bath build, in order.

First the shower pan and the walls that surround it. This is the stage that decides whether you have a problem later.

Then tile goes up, one course at a time, with spacers holding every line until it sets.

Then the floor goes down, cut and laid to a pattern that has to line up at every doorway and every corner.

Every step here is one you will never see again once the job is done.

One point of contact from demo through punch list.

Webster Kitchen and Bath
Bathroom and kitchen remodeling across Reading and Berks County
(484) 513-2105

Same room. Two very different mornings.Before, you had a tub, a separate shower stall behind frosted glass, and a vanity...
08/17/2026

Same room. Two very different mornings.

Before, you had a tub, a separate shower stall behind frosted glass, and a vanity that ate the walkway. Three things competing for a space that was never big enough for all three.

After, it is one walk-in shower, a double vanity, and a full-height linen cabinet. Nothing fights for room anymore.

Most of what makes a bathroom last is behind the walls, so you will never see it in a photo. It is the part we spend the most time on.

One point of contact from demo through punch list.

Webster Kitchen and Bath
Bathroom and kitchen remodeling across Reading and Berks County
(484) 513-2105

Before and after on a Wyomissing bathroom.Same footprint, same window, same layout. What changed is the floor, marble-lo...
08/16/2026

Before and after on a Wyomissing bathroom.

Same footprint, same window, same layout. What changed is the floor, marble-look tile wall to wall replacing the old vinyl, and a black-framed sliding glass door where the shower curtain used to be.

You do not always need to move walls. Sometimes you just need to replace the surfaces that make a room feel dated.

Call or text (484) 513-2105 for a free estimate.

Same cabinets. Same layout. Different kitchen.Nothing was torn out here. The boxes and the doors are the originals, take...
08/15/2026

Same cabinets. Same layout. Different kitchen.

Nothing was torn out here. The boxes and the doors are the originals, taken down, refinished in a cream white base with a brown distressed glaze, sealed with a clear topcoat, and hung back up. The granite, the travertine backsplash, and the tile floor all stayed exactly where they were.

If your cabinets are solid and you just cannot stand looking at them, this is usually the answer, and it is not a gut.

One point of contact from demo through punch list. (484) 513-2105

This is the stage nobody asks to see, and it is the one that decides everything.A preformed Schluter Kerdi waterproof cu...
08/14/2026

This is the stage nobody asks to see, and it is the one that decides everything.

A preformed Schluter Kerdi waterproof curb. A 2 inch outlet Schluter Kerdi drain. The fastener heads get sealed in the next step, then tile goes on and none of it is ever visible again.

A shower does not fail at the tile. It fails behind it, years later, at the details nobody photographs.

One point of contact from demo through punch list.

Webster Kitchen and Bath
(484) 513-2105

Address

Reading
Mohnton, PA
19540

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when Webster Kitchen & Bath posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share