06/09/2026
🚧 Concrete Replacement Project
We removed the existing concrete entry walkway and installed a new ADA-compliant entrance path designed for a smooth, safe transition to the building.
✔️ Demolition and haul-off of existing concrete
✔️ Subgrade preparation and compaction
✔️ 4" thick, 4,000 PSI concrete
✔️ #3 rebar reinforcement at 18" O.C. each way
✔️ Broom finish with control and expansion joints
✔️ Complete cleanup included
Another trip hazard eliminated with a durable, long-lasting solution. Proud to deliver quality workmanship and improved accessibility for this apartment complex in Modesto, California.
📞 Call us today for your FREE estimate!
(209) 758-5438