06/24/2026
Some jobs are about giving closure after difficult circumstances, and we’re thankful to have been involved.
For this project, we demolished and removed a fire-damaged home and restored the site for the next build:
Estimated tally:
▪️ ~5 working days
▪️ ~120 ft type A silt fence installed
▪️ ~300 tons of debris hauled off
▪️ ~150 tons of concrete removed
▪️ ~220 cubic yards of sandy clay hauled off
▪️ Final grading and stabilization completed
▪️ Seeded with Bermuda and Brown Top Millet
▪️ Protected with 8 bales of Bahia for erosion control
Demolition to site restoration. Clean, stable, and ready for the next chapter.
PATE Civil & Marine
Site Preparation • Demolition • Stormwater Solutions