Demo Boys

Directions Contact the business

Demo Boys DEMO BOYS Has recently partnered up to bring a little fashion to the industry. get your DEMO BOYS T-
(1)

10/20/2026

DemoBoys Basics: Site Preparation

Every successful project starts with proper site preparation. Big or small, containment always comes first!

Before any demolition begins, we take the time to prepare the workspace and control where the dust and debris will go.

As we walk through this job site, you’ll notice a few key details.

First, a Containment Solutions zipper door provides easy access while keeping the work area isolated.

Next, we’ve sealed a window with plastic, leaving an opening for our air scrubber’s intake duct. This allows us to draw dirty air outside while maintaining negative air pressure inside the workspace.

A second doorway is completely sealed off to prevent dust from migrating into the rest of the home.

Finally, we’ve installed another Containment Solutions zipper at our debris removal window. This gives us a convenient exit for demolition debris while allowing us to quickly seal the opening between loads.

There’s no single perfect way to set up containment. Every house, every job site, and every project presents different challenges.

But the principles never change.

KEEP IT CONTAINED!

If you enjoy learning the tricks of the trade, give us a like and subscribe to DemoBoys for more practical construction tips!

I hope you found this video helpful for your next project. Thank you for watching, and as always, Happy Building!

10/14/2026

WE HAVE A PROBLEM!

Me: The Zonzini Skipper isn’t balanced properly for this machine!

Carlos: No problem, we can use the Domino!

Me: Wait… the landing is too small to make the turn.

Gabe: All good! We can ballerina!

Me: Yeah, no. This thing weighs 755 pounds!

C&G: Well, I guess we’re going to have to FLOAT THE TURN!

Me: PASS ME THE CHAIN HOIST!!!

755 pounds, a tight staircase, an impossible landing, and a little mechanical ingenuity. There’s always another way!

This is just a sneak peek! Stay tuned, and head over to DemoBoysTV on YouTube for the full-length video of how we tackled this 755-pound monster!

I hope you found this video helpful for your next project. Thank you for watching, and as always, Happy Building!

HappyBuildin

Happy Flex Friday!
10/09/2026

Happy Flex Friday!

10/08/2026

Containment Solutions by DemoBoys—Coming Soon!

Big moves get the spotlight, but interior residential demolition is still at the core of DemoBoys. Great demolition starts with the basics—and dust containment is one of them.

Today, we’re sharing how we install zipper openings in our plastic containment walls. Proper installation creates a practical entrance while helping keep demolition dust inside the work area.

Watch closely and pause as needed to follow the techniques. Whether you’re a DIYer, a weekend warrior, or a seasoned professional, these details can make your next setup better.

Planning a renovation? DemoBoys delivers precise interior demolition with careful preparation and respect for your home. Message us to discuss your project!

I hope you found this video helpful for your next project. Thank you for watching, and as always, Happy Building!

10/06/2026

1,688-Pound Mantel Stone—Precision Placement! 🪨

Part 2 of our fireplace installation: the hearth is set—now comes the massive mantel!

The Movex mini crawler crane gets it into position. A WARN PullzAll winch with a 4:1 pulley system handles the slow, controlled lowering into place.

Subscribe to DemoBoysTV for more heavy moves and clever construction techniques!

I hope you found this video helpful for your next project. Thank you for watching, and as always, Happy Building!

10/05/2026

500 Pounds. No Stairs. No Problem.

How do you move a 500-pound radiator from the second floor when there’s no staircase? Secure it, lower it by winch onto a Zonzini, and track it into the garage for safekeeping.

High-tech isn’t the only tech. Keep plenty of arrows in your quiver—when plans A, B, and C don’t work, have a plan D ready.

DemoBoys—heavy moves, smart solutions.

I hope you found this video helpful for your next project. Thank you for watching, and as always, Happy Building!

Address

Milwaukee, WI

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Demo Boys posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Demo Boys:

Shortcuts

Share