10/15/2026
Concrete restoration has a way of surprising you once the work begins.
This precast parking structure in Madison looked like a manageable project from the outside. Once demolition started, a different picture emerged — deterioration far beyond the original estimate, across nearly every scope of work.
CMR's team scaled up to match conditions and delivered: double-tee edge repairs, full sealant replacement, vector connection and column repairs under full containment, and a new traffic-bearing waterproofing membrane across the deck. A fully restored, watertight structure.
That's what 30 years of restoration experience looks like — the ability to handle what the structure actually needs, not just what it looked like on paper.
Have a structure that needs assessment? → concretemasonryrestoration.com