09/25/2026
Building pad we completed a few weeks ago!
All topsoil had already been removed from the site when we arrived. We came in, shot elevations, cut and filled the pad to the proper grade, and compacted everything to create a solid foundation for the new garage.
We also removed one large stump from the corner of the building pad. Once the pad was completed, we installed a French drain and yard basin along the edge of the concrete to help with drainage.
We also installed an additional parking area off the concrete for the customer.
Project details:
• 54’ x 96’ building pad for a new garage
• 45 tons of #56 washed gravel
• 1 large stump removed
• Pad cut, filled, graded & compacted
• French drain installed
• Yard basin installed
• Additional parking area installed
‼️Call or text us at 330-904-9451 to set up a free estimate or message us on our page.‼️
Rueger Orr, Owner
[email protected]
https://orrexcavating.com