10/11/2026
Finished up phase #2 at East Meadow Condominiums in Manchester, complete dig out and replace of sidewalks and asphalt curbs, tac coat and resurface parking lot, rip out, gravel and pave roadway with 2” of base asphalt and 1 1/2” of finish asphalt, Shout out to the crew for putting in the work on getting it done and keeping it open for all the residents to come in and out during the work.