Want to host Thanksgiving (Thursday, Nov 26) in a new kitchen? Here's the real timeline of a Rockstar project, step by step:
1๏ธโฃ Pick your slab. 1 day to 2 weeks. Come see the stone in person. The faster you decide, the more breathing room you have.
2๏ธโฃ Template. We measure on site and check that your cabinets are installed and level before anything gets cut.
3๏ธโฃ Fabrication. Your stone is cut and finished in our own shop. No outside fabricator, no hand-offs.
4๏ธโฃ Install. Usually 4โ8 hours for a standard kitchen.
โฑ๏ธ From template to install: 10โ15 business days. In the busy season, add 3โ7 more.
Do the math: worst case, the whole process takes about 6 weeks, and there are about 6 weeks left until Thanksgiving. The best time to start is this week.
๐ Call 314-766-9365 or book a free design consultation at https://rockstargranitestl.com
๐ Full timeline guide: https://rockstargranitestl.com/blog/how-long-does-countertop-installation-take/
๐ Our process: https://rockstargranitestl.com/our-process/