09/08/2026
Louisville Paving and Construction is widening 2.65 miles of US 150, with over 460,000 CY of dirt and rock removal. The project is removing dangerous curves and reducing congestion with new turn lanes and passing lanes, while our team tackles steep grades and three large rock pinnacles through top-down excavation sequencing and blasting.