Hunter Plastering LLC

Hunter Plastering LLC famiily owned and family operated. father and two sons. approximately 70 years combined experience. no job too big or small.

A living room and dining room we remodeled, we did everything from demo to flooring and trim. Greg came out of retiremen...
01/22/2025

A living room and dining room we remodeled, we did everything from demo to flooring and trim. Greg came out of retirement for a day to help with trim.

Nice, easy ceiling for a rainy Monday morning.
10/01/2024

Nice, easy ceiling for a rainy Monday morning.

Another house we finished today, we also hung the board. About 310 sheets.
07/11/2024

Another house we finished today, we also hung the board. About 310 sheets.

This house had 3 bedrooms with plaster medallions in the ceilings and the homeowner wanted them removed and the ceilings...
10/26/2023

This house had 3 bedrooms with plaster medallions in the ceilings and the homeowner wanted them removed and the ceilings patched.

408 square foot ceiling at 10 feet high. 1st picture is boarded, 2nd picture is hardkoted, 3rd picture is the lime finis...
06/02/2023

408 square foot ceiling at 10 feet high. 1st picture is boarded, 2nd picture is hardkoted, 3rd picture is the lime finish swirled. Good bit for one guy today.

Bedroom ceiling that we hung board over, hardkoted and smoothed. Sorry for the glare from the windows.
04/25/2023

Bedroom ceiling that we hung board over, hardkoted and smoothed. Sorry for the glare from the windows.

Stucco job we finished today at a local social club/event center. Took a little longer than we planned but it turned out...
04/20/2023

Stucco job we finished today at a local social club/event center. Took a little longer than we planned but it turned out nice.

2 bedrooms, living room and kitchen we finished yesterday. We didn't get any before pictures of the kitchen.
03/26/2023

2 bedrooms, living room and kitchen we finished yesterday. We didn't get any before pictures of the kitchen.

We finally finished the yard side of this job. Building the scaffold was a pain because of the steep grade. The front an...
09/16/2022

We finally finished the yard side of this job. Building the scaffold was a pain because of the steep grade. The front and this side were the hardest, the rest of it is a lot easier. Hopefully they're ready for us to finish before the middle of winter!!

The hard part is over. The rest of this job will be easier and go quicker.
08/25/2022

The hard part is over. The rest of this job will be easier and go quicker.

We got the top half finished even though we battled the rain a few days. The rest of this job should go so much quicker ...
08/12/2022

We got the top half finished even though we battled the rain a few days. The rest of this job should go so much quicker and a little easier.

Been a long few weeks fighting the rain and trying to work over the cement that wasn't formed to be plum, square, or fla...
08/08/2022

Been a long few weeks fighting the rain and trying to work over the cement that wasn't formed to be plum, square, or flat but we're getting there. Hopefully we'll have this whole front done by the end of the week..... weather permitting.

Address

Ligonier, PA
15650

Telephone

+17242446876

Website

Alerts

Be the first to know and let us send you an email when Hunter Plastering LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category