09/04/2026
Existing columns one day, gone the next! The Kentucky State Capitol Renovation just achieved a very cool and unique milestone. Four historical columns (circa 1906) were hydraulically jacked to slowly transfer their load onto our new girders. Once all the load was successfully and safely transferred, and the permanent connection was made, the existing columns were removed, creating an open space for the Legislator’s new Conference Room. Thank you to Champlin Studios for being ambitious in asking if column removal was even possible and wonderful ex*****on by Messer Construction Co., Tomrook and Hayden Steel!