Nobody wants to finish a project and realize they should’ve planned for something else. 😅
This homeowner in Wi******er needed a dedicated 30-amp RV power connection.
But here’s something we planned ahead for: the wiring was sized with a possible future 50-amp changeover in mind.
The project included underground trenching, electrical installation, and backfilling to get power where it was needed.
It’s a good reminder that sometimes the smartest part of an electrical project happens before the digging even starts.
Planning RV power, a workshop, or another electrical addition to your property? Tell your electrician what you need now AND what you might want down the road. It can make a big difference in how the project is planned.