05/29/2026
Progress is stacking up at Beckwith Station!
On the exterior, sheathing installation is underway sealing up the building envelope. Inside, second floor interior walls are being framed. Below grade, underground utilities are being trenched and run around the site.
This is the kind of work you don't always see but is critical to everything above it. More to come as this one continues to rise!