Completed Project | Pelican Bay Condominiums - Gulfport, Florida
WKM just wrapped up the Pelican Bay project on October 15th.
The Original Scope of work included;
Removal of all existing balcony tile (22,000 ft.ยฒ)
Concrete Repairs to horizontal concrete slabs (285 ft.ยณ)
Application of Protectosilยฎ CIT to all concrete balcony slabs (22,000 ft.ยฒ)
Installation of Sikaflexยฎ CR195 Sealants (9,100 l.ft.).
Application of Sikalasticยฎ 1500 Pedestrian Waterproofing System (22,000 ft.ยฒ)
All decks were finished off with tile pattern decretive finish.
Additional Work
During Hurricane Helene, the condo took on several feet of water in their parking garage and generator room. The condo asked WKM to install flood barriers at critical locations on their ground floor level which included their generator room, electrical room, and pump room.
Additionally, It was determined through the use of GPR (Ground Penetrating Radar) that there were large voids underneath their ground floor balconies. WKM teamed up with LRE Foundation Repair to chemically inject polyurethane foam to stabilize the decks.