01/17/2026
We came to prep up this home for the spring for a full restoration. You can say there was some rot on this home. Over 250 ft of repair work done. Check it out! Restoration work later to follow later this year!
-220 linear ft of refacing
-7 deck posts replaced. Installed screw jack leveler so there’s no contact between log and concrete. Prevents bottom end from rotting in the future.