10/13/2026
We grade excavation sites at a 2% slope minimum, angled away from your foundation. This directs water runoff and stops pooling that leads to cracking in your new concrete driveway or patio.
Skipping this step during dirt work can mean costly repairs down the line. Visit bmconstructionco.com to plan your concrete project with us.