Allen Road Project 3 - Inside Tour with Skip Murphy
Today we’re heading inside the Allen 3 build to show you the full second‑floor transformation taking shape.
On the first level, this front room is being pushed out 5½ feet, the vaulted ceiling is coming down, and a brand‑new second floor will be framed above it. Windows are being relocated to match the new layout and flow of the home.
Upstairs is where the major work begins — it’s a full gut renovation. We’re removing every exterior wall, every rafter, every ceiling beam, all the bedrooms, the existing bathroom, and the deck over the garage. Everything on this level is being rebuilt from scratch.
The new second floor will feature:
• Three bedrooms on the right side
• A relocated hall bathroom for the kids
• A full master suite upfront
• A walk‑in closet over the existing garage
• A new master bath in the rear corner
This project adds significant square footage and completely reimagines how this home will live for the family.
Skip walks you through every room, every change, and the full plan for the rebuild. Big things happening on Allen Road.
More updates coming next week — enjoy the day, everyone.