09/02/2026
🏠 **HOME BUILDERS — LET’S TALK ABOUT KEEPING YOUR PROJECT MOVING.**
On a new home, every trade is working around the next one.
Trim gets installed.
Then finishing needs to happen.
Other trades are working in the same space.
Floors, cabinets and finished surfaces need to be protected.
And one delay can start affecting everything behind it.
**What if more of that finishing happened BEFORE the material ever reached the house?**
That’s where our new **Bayerl Painting Pre-Finish Facility** comes in.
We can move the finishing process into our controlled shop environment so material can arrive at the project already finished and ready for the next step.
For home builders, that can mean:
✔️ Less finishing happening inside the new home
✔️ Less masking and protecting finished surfaces
✔️ Fewer trades working around each other
✔️ More consistent finishes from piece to piece
✔️ Less jobsite mess and cleanup
✔️ A smoother, more predictable building schedule
And for builders doing multiple homes every year, we're not looking to just finish one order.
**We want to become a finishing partner you can rely on project after project.**
Have a house coming up? Send us your material list, quantities, finish/color and timeline and **let us price one for you.**
📞 Joey — **612-501-5107**
📧 [[email protected]
📣 **FOLLOW OUR PAGE!**
Some Facebook groups limit how often we're able to share our posts, and we have A LOT more coming as we get this new facility up and running.
👉 **Follow the Bayerl Painting page to follow along!**
Over the next few weeks we'll be breaking down how our pre-finishing process can help **builders, contractors, remodelers, lumber yards, installers, painters and homeowners.**
Follow along to see the facility come together, learn more about the process, and see how **pre-finishing could change the way your next project gets done.**
**FINISH IT BEFORE IT REACHES THE JOBSITE.**