Last of the infrastructure going in as the septic tank and drainfield get installed. Meanwhile we are finishing up the p...
10/07/2024

Last of the infrastructure going in as the septic tank and drainfield get installed. Meanwhile we are finishing up the powder bath, trimming the stairs and building a handrail.

All kinds of projects going on. Shower waterproofing rolled into tile work. Window trim wrapping up. Installed a wavy pa...
10/01/2024

All kinds of projects going on. Shower waterproofing rolled into tile work. Window trim wrapping up. Installed a wavy panel wall in the powder bath and recycled an oak piece for a countertop in the powder bath. Paneling going up in the kitchen, and a little decoration in the game room.

Once again, multiple trades in a day… while the propane tank got installed we finished the beams in the living room, pai...
09/17/2024

Once again, multiple trades in a day… while the propane tank got installed we finished the beams in the living room, painted the ceiling and got the lighting and speakers installed. Moved on to installing the electric radiant heat in the office floor and then started waterproofing showers. Much to do but getting closer all the time.

While the drywall was wrapping up we made progress on the decks! Then sprayed 100 gallons of primer and paint. With that...
09/04/2024

While the drywall was wrapping up we made progress on the decks! Then sprayed 100 gallons of primer and paint. With that dry we jumped right into trimming the electrical. Ceiling fans, bath fans, smoke detectors and most of the ceiling lights up and running. Starting to look like a house…

The drywall crew is making out well! With them taking over the interior, we got working on the decks on the south side. ...
08/26/2024

The drywall crew is making out well! With them taking over the interior, we got working on the decks on the south side. Once they cleared out of the living room we started the ceiling paneling. And, we picked up a little paint…

With the insulation done and that inspection passed, drywall got loaded and the hanging well under way. Drywall finishin...
08/18/2024

With the insulation done and that inspection passed, drywall got loaded and the hanging well under way. Drywall finishing to happen this coming week.

With all rough inspections passed we have lucked out with a cancellation on the insulation company’s schedule and they a...
08/11/2024

With all rough inspections passed we have lucked out with a cancellation on the insulation company’s schedule and they are working fast to make a yeti cooler out of this place. It should prove to be very easy to heat and cool. We are making strides finishing ceilings where we can as well.

So Comcast/Xfinity gave us a little wire to bury from the street… pretty sure they think we are building a 60 unit apart...
08/07/2024

So Comcast/Xfinity gave us a little wire to bury from the street… pretty sure they think we are building a 60 unit apartment complex! The internet service better be flawless!! I guess no signal drop over the 400’ we buried!

Lots of infrastructure going in. Finished up the floor heating, buttoned up the fresh air and make up air systems. Hooke...
07/28/2024

Lots of infrastructure going in. Finished up the floor heating, buttoned up the fresh air and make up air systems. Hooked up the whole house dehumidifier. Installed drain lines for dehumidifier and fresh air. Finished the duct work for both as well. Also wrapping up the electrical work and installing the kitchen hood. Getting close to insulation and drywall.

Doors all in, despite the insane heatwave! Still much trim and waterproofing to complete. Also running gas lines and ass...
07/16/2024

Doors all in, despite the insane heatwave! Still much trim and waterproofing to complete. Also running gas lines and assembling the in floor heating system.

It’s been a busy couple weeks getting metal on the porch and dormer roofs and getting plumbing, hvac, electrical install...
07/10/2024

It’s been a busy couple weeks getting metal on the porch and dormer roofs and getting plumbing, hvac, electrical installed. This week, it’s time to install doors.

This week we wrapped up the 2nd floor electrical and started installing supply lines to all the 2nd floor plumbing fixtu...
06/22/2024

This week we wrapped up the 2nd floor electrical and started installing supply lines to all the 2nd floor plumbing fixtures. We also reconfigured the vent piping to fit wall mounted faucets in the baths. Starting to get crowded in these walls.

Address

Hurlock, MD

Alerts

Be the first to know and let us send you an email when BNG Design Build posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to BNG Design Build:

Share

Category