10/07/2026
Our Local Buckhorn Bucks Basketball locker rooms just got a major facelift🇺🇸🔥🦌
We removed the existing LVP and carpet from the locker rooms—installed a slurry cementitious base coat over the 1 inch bathroom tile—grinded and prepped the concrete—installed a flake system—& sealed it with a Poly-Aspartic High Wear Finish😎
Can’t wait to see this floor in action!