09/18/2026
This job started out as a 3 day subfloor job but turned into a 3 week foundation replacement job. We replaced roughly 80 percent of the floor joists, all of the subflooring and installed a v***r barrier under the entire house. We then installed new flooring throughout the home along with new base boards and door casing.
I didn’t take the best photos but here’s what we started with and what we turned it into.
Feel free to share!
903-563-5035