06/09/2026
From the inside out, received a complete, thoughtful transformation designed to support both daily operations and long-term growth.
Every element of the space was refreshed with functionality, durability, and aesthetics in mind.
This project included a comprehensive interior buildout featuring a new conference room, break room, bullpen workspace, and fully renovated restrooms- each tailored to enhance collaboration, comfort, and efficiency for the VoltaGrid team.
In addition to the interior upgrades, the scope extended to exterior improvements such as painting, concrete work, landscaping, lighting, and roofing, creating a cohesive and polished look from the outside in.
From modernized interior workspaces to impactful exterior enhancements, this project was executed with purpose, attention to detail, and a commitment to quality at every stage.
Thank you to everyone involved for the collaboration and dedication that helped bring this project successfully across the finish line.
ON TIME. ON BUDGET.
Client:
Architect:
MEP Engineer:
Civil Engineer:
Structural Engineer:
Photography: