Albany Studio

Albany Studio Architecture and Construction company based in Houston, Texas.

A beautiful homesite with a constant breeze, and waterfront views! We are excited to see this one take shape.
04/17/2026

A beautiful homesite with a constant breeze, and waterfront views! We are excited to see this one take shape.

04/16/2026

Loving the natural character of this homesite site, beautifully surrounded by towering trees. The vision is starting to take shape. 👌🙌

Good homes deserve good foundations. ✅Foundation complete — ready for framing.
04/16/2026

Good homes deserve good foundations. âś…

Foundation complete — ready for framing.

FAQ: How long does it take to design a house?Our design process follows four organized phases, each building on the prev...
04/12/2026

FAQ: How long does it take to design a house?

Our design process follows four organized phases, each building on the previous step:

• Pre-Design
• Schematic Design
• Design Development
• Construction Documents

Depending on the size and complexity of the home, this process typically takes 3–5 months depending on the project details.

Each phase is completed sequentially to ensure a clear direction, refined details, and a well-coordinated final design before construction begins.

This custom round Blue Agate tabletop was crafted as a statement piece for the dining room at a recently completed home ...
04/12/2026

This custom round Blue Agate tabletop was crafted as a statement piece for the dining room at a recently completed home in River Oaks.

04/08/2026

Clearing out a homesite for a quiet escape nestled in the trees.

Coming soon. Stay tuned.

04/05/2026

When it doesn’t exist… let’s do it! 🙌

04/04/2026

A solid project starts with a solid foundation.

Today’s pour sets the stage for everything that comes next. Planning, coordination, and ex*****on all come together in moments like this.

It may just look like concrete — but this is where the entire project begins.

Two of the most common questions we hear when planning a new home:🏡 Permitting timeline: Plan for about 3–4 months in th...
03/28/2026

Two of the most common questions we hear when planning a new home:

🏡 Permitting timeline: Plan for about 3–4 months in the City of Houston
🔨 Construction timeline: Most custom homes take 12–14 months

Every project is unique, but setting realistic expectations early helps make the entire process smoother.

Have questions about building? Send us a message — we’re happy to help.

02/15/2026

When you have great views, design a place to sit near the window. Or in the window! … . .

Yesterday we had the privilege of a brief visit with clients from a project that began after Hurricane Harvey.Being back...
02/14/2026

Yesterday we had the privilege of a brief visit with clients from a project that began after Hurricane Harvey.

Being back at the home with the owners gave us time to reflect on the project. Here are a few demolition and early construction photos.

I’m grateful for clients who trusted us during big transitions, and I’m glad to see how well this home has served their family over the years.

Address

2802 Albany Street
Houston, TX
77006

Alerts

Be the first to know and let us send you an email when Albany Studio posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Albany Studio:

Share