KCK Builders LLC

KCK Builders LLC Service Disabled Veteran Owned. Framing, Drywall, Paint, GC with offices in Hawaii, Idaho, Florida.

Tucson, AZ, B50 - Expand Renovate VA continued framing corridor wall C13 up to the deck above, working through a congest...
08/14/2026

Tucson, AZ, B50 - Expand Renovate VA continued framing corridor wall C13 up to the deck above, working through a congested overhead area where precision matters.

The crew also installed corridor backing, laid out the communication room, and continued top-out work for the hard lid ceilings.

For owners, developers, and project partners, this is the kind of progress that matters before the finishes ever go up: coordinated work, clean ex*****on, and steady movement toward the next phase.

The crew continued installing doors in the high-security area, completed cement board and fire taping on the 2nd floor r...
08/12/2026

The crew continued installing doors in the high-security area, completed cement board and fire taping on the 2nd floor roof walls, and kept moving on flashing, perforated flashing, insulation, and cement board along the north side.

Small details like fire tape, flashing, and insulation may not always stand out on camera, but they play a big role in protection, durability, and keeping the structure ready for the next phase.

Every layer matters before the finish comes in.

KCK Builders LLC
Visit us: www.kckbuildershi.com
[email protected]
(208) 254-0445 | 727-350-8799

Progress keeps moving inside and out. Corridor drywall is underway, while exterior waterproofing patches are being handl...
08/10/2026

Progress keeps moving inside and out. Corridor drywall is underway, while exterior waterproofing patches are being handled around the updated light locations.

Stay tuned for the next phase.

Our team worked on the interior pass-through installation, completed patch work, and lowered the table near the pass-thr...
08/08/2026

Our team worked on the interior pass-through installation, completed patch work, and lowered the table near the pass-through opening for a cleaner, more functional setup.

Here’s the interesting part: pass-throughs may look simple, but in pharmacy spaces, they help keep workflow organized by allowing materials to move from one side to another without disrupting the room setup.

It’s the kind of behind-the-scenes detail most people don’t notice, but it makes a big difference once the space is in use.

Progress continues at the Atlanta VA - Pharmacy site.

KCK Builders LLC
Visit us: www.kckbuildershi.com
[email protected]
(208) 254-0445 | 727-350-8799

Bay Pines VA Site UpdateThis is where the behind-the-scenes work matters.Our team continued wall finishing and fire stop...
08/05/2026

Bay Pines VA Site Update

This is where the behind-the-scenes work matters.

Our team continued wall finishing and fire stopping in 2A-102, 100-301, and 3A-102, while also moving forward with shaft wall framing in 100-501.

The 100-501 door frame was set, and south wall framing began. During the work, a pre-existing junction box was found in the way, and all proper parties have already been notified.

Even with the service elevator down after lunch, progress kept moving.

Step by step. Detail by detail.
That’s how the build moves forward.

KCK Builders LLC
Visit us: www.kckbuildershi.com
[email protected]
(208) 254-0445 | 727-350-8799

The work most people never see is the work the building depends on.At B50 Expand Renovate VA in Tucson, Arizona, crews p...
08/03/2026

The work most people never see is the work the building depends on.

At B50 Expand Renovate VA in Tucson, Arizona, crews prepared the fire-rated walls for fire caulking, continued framing the hard-lid ceilings, and installed FR blocking for the barn doors.

The security-room window was also readied for field measurements for the bullet-resistant glass, while outside, the final waterproofing coat was applied to the horizontal 3/4" expansion joint.

These are the details that eventually get covered, but never get skipped.

KCK Builders LLC
Visit us: www.kckbuildershi.com
[email protected]
(208) 254-0445 | 727-350-8799

Lanakila Gym | Makai SideThe makai side is starting to look brand new.Primer is on, tan finish paint is going up, and th...
07/29/2026

Lanakila Gym | Makai Side

The makai side is starting to look brand new.

Primer is on, tan finish paint is going up, and the site is cleaned up with all tools and the scissor lift headed back to the warehouse.

From prep to finish, this side is coming together fast.
Experience the KCK difference.

Most people notice the finished exterior.But the real protection starts before the final look.At Maui Secure Research MC...
07/27/2026

Most people notice the finished exterior.
But the real protection starts before the final look.

At Maui Secure Research MCAF, our KCK Builders team continued installing Z-metal, caulking, and insulation around the building, along with flashing on the two penthouse doors.

These are the details that help seal openings, protect transitions, and keep the building envelope performing the way it should. It may not be the flashiest part of the job, but it is one of the most important.

Clean prep. Protected edges. Stronger finish.
Experience the KCK difference.

KCK Builders LLC
🌐 www.kckbuildershi.com
📧 [email protected]
📞 (208) 254-0445 | 727-350-8799

Before the fresh finish, the prep has to be done right.At Lanakila Gym, our team completed pressure washing on the Diamo...
07/24/2026

Before the fresh finish, the prep has to be done right.

At Lanakila Gym, our team completed pressure washing on the Diamond Head side, patched cement on the mountain side, and taped off windows on three sides of the gym. These steps may not be the final look yet, but they are what set the foundation for a cleaner, stronger, and longer-lasting finish.

Three sides are now ready for primer tomorrow, and this site is one step closer to a full exterior refresh.

Stay tuned for the progress. The transformation is just getting started, and we cannot wait to show how this gym looks when the finish comes together.

Experience the KCK difference.
KCK Builders LLC
Visit us: www.kckbuildershi.com
[email protected]
(208) 254-0445 | 727-350-8799

Address

Honolulu, HI

Alerts

Be the first to know and let us send you an email when KCK Builders LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to KCK Builders LLC:

Shortcuts

Share

Category