08/13/2026
It’s been a little while since we’ve made a post, but we’ve been keeping busy this summer! Here’s a look at some of what we’ve been up to since our last update:
🚧 Bucksport — Completed a large septic system installation, including a concrete chamber leach field. The system has been inspected, approved, and is all set to go.
🛣️ Waterville — Continued work on the large Kennebec Water District project, including paving and lawn installation. We’ll be back later this fall to complete the remaining work.
🌱 Hermon — Completed a large lawn installation with loam, seed, and hay, along with spreading several loads of riprap to improve a steep, difficult-to-mow area.
🏗️ Orrington — Installed a large section of silt fence for J.F. Brennan Company as part of their work on the Penobscot Thin Layer Cap Project.
🧱 Bangor — Completed a 10’ x 20’ concrete slab and electrical conduit installation for Wabanaki Public Health & Wellness.
We’ve also been keeping busy with plenty of smaller projects throughout the area that didn’t make it into this post — from smaller excavation and drainage work to site work and everything in between.
It’s been a busy summer, and we’re grateful for all of the customers, contractors, and organizations who have trusted P.C. Earthworks with their projects. We appreciate the continued support!
📞 P.C. Earthworks Inc.
Jake Cyr — 207-356-4704