Wrapped up this large bathroom project!
The old layout had the vanity as part of the master bedroom, then through a door was the toilet and shower.
- Relocated the partition wall to place the vanity inside the bathroom space.
- Removed a hall closet to expand the size of the shower.
- Relocated all the shower plumbing along with the vanity plumbing.
- Relocated all the lights, outlets, and switches.
- Installed a new vent fan and put in a soffit vent.
- Relocated a walk in closet door to the bedroom wall.
- Installed tile floor with radiant heat.
- Installed shower tile including 2 niches.
- Installed 48" vanity plus an 18" wide pantry cabinet.
- Installed shower door, fold down shower seat, and grab bar.
Very happy with how this project turned out, and the new layout makes a lot more sense.