01/24/2026
We just finished phase 4 of the construction. We have transitioned into phase 5 where the focus moves from the buildings core structure to its esthetic’s and functional completion. This fast-paced phase involves the precise installation on pre-selected materials on both interior and exterior.
The importance of meticulous planning and selection processes from earlier stages become evident in this phase.
Working with a interior designer provides professional expertise in layout, color, and material selection while saving you time, reducing stress, and preventing costly mistakes.
We have interior doors installed, trim going in, tile showers completed, floors tiled on main level, bathroom tile on second floor laid, shiplap accent walls installed, tongue and groove ceiling in foyer, interior and exterior fireplaces installed, first coat of primer on ceilings and walls, floors protected, temporary heating and cooling in place, *side note* at She Builds we take pride in our builds making sure to protect materials installed and the environment in which they are being installed. Temporary heating and cooling helps to protect building materials (wood, cabinets, drywall) from moisture-related damage like warping or cracking, materials curing times, and importantly to me, improves worker comfort! Outside we are finishing the metal siding, building the steps, and laying straw to protect the brick skirt to prevent any red mud getting on the beautiful brick!
Follow along as we continue building the Guthries forever home! We cannot wait to get them in their new home.