10/19/2026
Another bathroom remodel completed. We removed the old school soaker tub that of course never gets used. Pulled out the standup shower, which was outdated Built the new shower handicap accessible with no curb. Framed in the window and bricked it up on the outside. Opened up the toilet room another 12 inches for more room. Switched out the old ceiling lights for LED wafer lights and installed a pocket door for the entry to make it easier for a wheelchair in the future.  then installed plenty of handicap grab bars throughout the shower and toilet area.  They are living their new bathroom.