The bathroom was completely renovated, which involved removing the step and drain pipes, cutting out the floor, and installing new drain pipes. A concrete trench was created, and floor leveler was poured. The walls were framed, goboard was installed on the shower walls, and a shower pan was put in place. The shower floor and walls were tiled, as was the shower niche. The bathroom floor was also tiled, and both the shower and bathroom floors were grouted. Wainscoting was installed, followed by the toilet and vanity. Finally, the ceiling, walls, and trim were painted.