08/07/2019
My team and I had a unique challenge here on this project. We had to fill behind the retaining walls and between the upper concrete floor and a broken layer of concrete 1’ to 2’ thick and the bottom concrete , as well as dirt and rock base. There where piers with plywood and timber support that stood out front that acted as a retaining wall. All of these voids , cracks and crevices were filled to stabilize the structure at fraction of the cost of large heavy equipment. We showed up at 3:30 am with two foam rigs so that we could beat the tide coming back in and so that the business could open at 11am on time. My crew and I made it happen! We are proud of what we do and we serve the entire state with this service.
Jason Lawrence from Insulation of Maine is a TerraThane Contractor who recently had the opportunity to help with a difficult problem that Portland's Flatbread Pizza Co. was experiencing with their building.