08/27/2026
Client complaint of sink hole number two- Catch basin was falling apart — rebuilt it from the base up. Kept the existing bottom, replaced the blocks, grade ring ring, and new flat top. Pumped through a high water table to get it done right. Stratford job moving right along!
•
•
•