05/05/2026
6x7 landing with waterfall steps. We decided to extend the footprint with both the length and the width. I gave the customer some longevity options for this so we agreed on running PVC on the bottom of the stringers and joist tape on all top surfaces of lumber. Framing included 3 6x6 posts with a triple girder carrying the joists, mid span blocking and all the stringers ended getting padded out with blocking and bolted into the slab in 6 different spots.
We decided on herring bone steps and outer two rows of the landing to help the deck flow into house and surrounding area.
Thank you so much for this opportunity. It was an absolute pleasure to see it come along so well. Thank you to Trever of Fortis Property Solutions LLC for hauling away all the debris. If you guys need anything done of that nature he is 100% your guy.