09/12/2026
This week, Ravco tackled a land development issue for a new local Toll Brothers community.
The original installation did not meet PennDOT and township engineering requirements, creating a challenge: remove the existing sidewalk and depressed curb, regrade the corner, and tie everything back into the existing sidewalk while maintaining ADA-compliant slopes and proper Pedestrian Access Routes.
After a day of removal and regrading, our crew lowered the corner approximately 10 inches to achieve the proper grades for the new sidewalk and ramps.
The result? Proper slopes, smoother transitions and safer access for everyone.
Another job done right by Ravco Construction!