04/04/2025
Hey guys we have been busy! I wanted to be able to showcase the projects we were getting knocked out more regularly so I took a break from posting to accumulate some more projects to show!
This is a remodel we did that was caused by a leak from the shower faucet. It ended up going into the bedroom adjacent to it so we had to replace some subfloor to be able to lay down some more flooring. Took care of the exposed drywall joints, painted the walls, and added a chalkboard section to be able to draw on!
The flooring was a floating lvp with corner bead added after installation. While we were at it we installed some floating lvp in the master bedroom as well! I forgot to take before pictures 😮.
The shower was the final boss with sub flooring, new shower valve, pan liner with a sloped dry pack before and after installation, and finally matching the tile that was there already and installing the tile for the shower pan!!
Thank you Janie and Alex for trusting us to get the job done!
More pictures to come more frequently of the jobs we have been getting knocked out!
For a free estimate give us a call or text at
254-715-5587